Assuming the weather holds, construction will begin this week on North Cottonwood, and in Britson Park. HERE is a drawing of Britson Park, and the grading elevations. The fields are not being put in now, but this shows where they will be.
Work they will be doing will include leveling the whole area, and giving a slight grade to drain to the southwest. The dashed lines indicate elevations now, solid lines are how it will be. The number is feet above sea level--like 1028.
There will be a berm to the east to protect the Britson Circle neighborhood. There will be a swale to the west, which will channel water away to an intake in the industrial park.
The whole area will be seeded with grass.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment